VIP Class Notes (Jesse) [W]

Vocabulary

laugh track
eg. when I hear the laugh track I am not laughing so I feel weird

i miss the joke < > i get the joke

relapse – to quit but then start doing the bad habit again
eg. I’m relapsing at the moment but I’ll stop again tomorrow

taken into account

they had 3 operators working in the line

trace / traceability 

redundant 
eg. I create redundancies by improving processes to reduce the headcount required for particular tasks

Pronunciation

prioritize – preye oh ri teyez

logistic = lojistik

loyal = soft “ye”

golf / magic – strong “Je”

Writing exercise

In 2015 Batz Kunshan plant define a new strategy for manufacture stamped parts in house, building a new factory next to current plant.

In order to optimize our Batz Kunshan process, we are doing a layout change improving all process productivities.

– Stamping machine and welding machines in new plant, building adapted for new equipment machines.
– Injection machines and assembly lines in old plant.

In the same way, with the new layout, we define to improve logistic process flow.

– Assembly line redesign:
o Working in U shape layout, to improve productivity and material feeding.
o Standard balance to define material flow for each line. Improving our assembly line productivities

– Logistic train: Material flow from warehouse to assembly lines each 20 minutes using a train to supply all assembly lines
o Taking in account material mixing, defining each assembly line with a color (visual aid) and trazability system.
o Defining in warehouse a supermarket to supply the train, defining supermarket, assembly line and boxes with a label color for each assembly line.
o Defining flow rack and supermarket dimension according a safety stock to not stop material feeding in the line

In 2015 Batz Kunshan plant defined a new strategy for manufacturing stamped parts in house, building a new factory next to current plant.

In order to optimize our Batz Kunshan process, we are doing a layout change, improving all process productivities.

– Stamping machines and welding machines in new plant, the building has been adapted for new equipment machines.
– Injection machines and assembly lines in old plant.

In the same way, with the new layout, we define to improve logistic process flow.

– Assembly line redesign:
o Working in U shape layout, to improve productivity and material feeding.
o Standard balances to define material flow for each line. Improving our assembly line productivities

– Logistic train: Material flow from warehouse to assembly lines each 20 minutes using a train to supply all assembly lines
o Taking in account material mixing, defining each assembly line with a color (visual aid) and traceability system.
o Defining a supermarket in the warehouse to supply the train, defining supermarket, assembly line and boxes with a label color (corresponding to) for each assembly line.
o Defining flow rack and supermarket dimensions according to a safety stock to ensure continuous feeding of the line. / to avoid any stops in the feeding of the line