i’m running 3 projects in Korea with a franchiser now / currently / at the moment / simultaneously and i went / flew / traveled / took a trip / took a flight there to / in order to inspect the site condition last Wednesday and / as well as to do the site survey / to survey the site. We just wanted to make / we were just interested in making sure Samsung did the right thing / kept following the site design / kept in line with the site plan. Since / As / Due to the fact that i am quite new there, it was my first business trip / it was my first opportunity to experience this kind of trip. i went with a colleague who’s pregnant / about to have a baby, i’m going to take over her / take control of her / take charge of her ongoing project. So / As a result / This is why, i went there with her for the mid-inspection / interim inspection. We checked the MEP equipment which stands for Mechanical Electronic P… and also the concealing construction and checked the measurement to ensure it matches / follows our design. After that / Following this we went through the checklist with Samsung and (also) GC.
repercussion – negative results
eg. there will be a lot of repercussions if I don’t do a good job
if they insist on opening
she can’t admit it – she doesn’t want to accept it and say it was her fault
Comments are closed.